Facility: "АТB" retail chain store (1100 m2) Address: Borislav (Lviv Oblast), st. Kovaliva, 14 Customer: ООО "АTB-Market" Duration of construction works: January-March 2020 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Interior decoration, facade works, and...

Facility: "АТB" retail chain store (1335 m2) Address: Bila Krynytsia, st. Rovenskaya, 112 Customer: ООО "АTB-Market" Duration of construction works: August 2019 – March 2020 The following works were performed: Facility construction Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Power supply...

Facility: "АТB" retail chain store (1050 m2) Address: Lyuboml, st. Nezavisimosti, 25 Customer: ООО "АTB-Market" Duration of construction works: June-December 2019 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Power supply facility; Interior decoration, facade...

Facility: "АТB" retail chain store (1000 m2) Address: Lutsk, st. Rovenskaya, 118 B Customer: ООО "АТB-Market" Duration of construction works: August - December 2019 The following works were performed: Facility construction Installation and connection of internal networks of water supply, water disposal, storm sewage, ventilation, and air conditioning; Power supply facility; interior...

Facility: "АТB" retail chain store (1000 m2) Address: Ovidiopol, st. Beregovaya, 4-b Customer: ООО "АTB-Market" Duration of construction works: July 2019 - December 2019 The following works were performed: Dismantling works; Excavation works; Concrete work (foundations, retaining walls); Works on the manufacture and installation of metal structures; Installation of a roof and a...

Facility: "АТB" retail chain store (1430 m2) Address: Shostka (Sumy Oblast), st. Svobodyi 30 Customer: ООО "АTB-Market" Duration of construction works: May-October 2019 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Power supply facility; Interior decoration,...

Facility: "АТB" retail chain store (740 m2) Address Lviv, st. Syaivo, 11-A   Customer: ООО "АТB-Market" Duration of construction works: January-April 2018 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Power supply facility; Interior decoration, facade works, and...

Facility: SPP "Malaya Belozerka" 22.9 MW Duration of construction works: 95 calendar days (including work in winter) The following works were performed: Design of metal structures for the installation of photovoltaic modules Geodetic breakdown of the site, supporting structures Drilling wells for support stands - 27300 wells. Assembly and installation of metal structures in the design...

  Facility: SPP «Makov-1», 9.9 MW Customer: ООО "EDS-ENGINEERING" Duration of construction works: August - October 2018. The following works were performed: Design of metal structures for the installation of photovoltaic modules Supply of metal structures to the facility. Geodetic breakdown of the site. Drilling wells for support stands - 14528 wells. Assembly and installation of metal...

Facility: SPP "Shyroke Solar Park", 12.55 MW Duration of construction works: 85 calendar days (including work in winter) The following works were performed: Design of metal structures for the installation of photovoltaic modules Geodetic breakdown of the site, supporting structures Drilling wells for support stands - 14854 wells. Assembly and installation of metal structures in the design...

  Facility: "АТB" retail chain store (1110 m2) Address Lviv, st. Vyigovskogo, 29 Customer: ООО "АTB-Market" Duration of construction works: June-November 2019 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Power supply facility; Interior decoration, facade works,...

Page 2 of 4