Projects

  Facility: "АТB" retail chain store (960 m2) Address: Lviv, st. Geroev UPA Customer: ООО "АTB-Market" Duration of construction works: May-October 20189 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Power supply facility; Interior decoration and facade...

  Facility: "VARUS" retail chain store (710 m2) Address: Dnipro, av. Bogdan Khmelnitsky, 36A Customer: ООО "ОMEGA" Duration of construction works: July - August 2018 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Power supply facility. Interior decoration...

  Facility: SPP "Fotone Energy Pogorodnoye", 15 MW The works were performed for 5.7 MW Address: Podgorodnoye, Dnipropetrovsk Oblast Customer: ООО "EDS-ENGINEERING" Duration of construction works: July - August 2018 The following works were performed: Design of metal structures for the installation of photovoltaic modules Supply of metal structures to the facility. Geodetic breakdown of...

Facility: "АТB" retail chain store (910 m2) Address: Novovolynsk, st. Druzhbyi, 6A Customer: ООО "АTB-Market" Duration of construction works: April-July 2018 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning; Power supply facility; Interior decoration, facade works,...

    Facility: SPP "Sun Energy Mezhirich", 2 MW Address: Mezhirich, Pavlogradskiy Rayon, Dnipropetrovsk Oblast. Customer: ООО "EDS-ENGINEERING" Duration of construction works: April 1, 2018 - May 1, 2018 The following works were performed: Design of metal structures for the installation of photovoltaic modules Supply of metal structures to the facility. Geodetic breakdown of the...

  Facility: "АТB" retail chain store (522 m2) Address Lviv, st. Zamarstyinovskaya, 123 Customer: ООО "АTB-Market" Duration of construction works: March-June 2018 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning, power supply facility; Interior decoration, facade...

  Facility: "АТB" retail chain store (1030 m2) Address Lviv, st. Nauchnaya, 7 Customer: ООО "АTB-Market" Duration of construction works: December 2017-March 2018 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning, power supply facility; Power supply...

Facility: Construction of an industrial basin Address:  Nova Kahovka Duration of construction works:   50 calendar days (including work in the winter) from November 5, 2017, till December 12, 2017. The following works were performed: The volume of the work performed on monolithic reinforced concrete 480 m3 The number of staff involved: 10...

   Facility: "АТB" retail chain store (1010 m2) Address: Zdolbunov (Rivne Oblast),  st. Shkolnaya 44 Customer: ООО "АTB-Market" Duration of construction works: September-December 2017 The following works were performed: Reconstruction of premises with the replacement of all internal networks of water supply, water disposal, ventilation, air-conditioning, power supply...

Facility: Construction of the medical university building Address: Mariupol Duration of construction works:   92 calendar days from June 10, 2017, till September 10, 2017 The following works were performed: The volume of the work performed on monolithic reinforced concrete 1320 m3 The number of staff involved: 15 specialists.     ...

  Facility: SPP  "Sun Energy", 2 MW Address Podgorodnoye Dnipropetrovsk Oblast Customer: ООО "EDS-ENGINEERING" Duration of construction works: July - August 2017 The following works were performed: Design of metal structures for the installation of photovoltaic modules Supply of metal structures to the facility. Geodetic breakdown of the site. Drilling wells for support stands - 3200...

Page 3 of 4