Object: Retail chain store "ATB" 1 088,0 m²
Address: Stary Sambir, Leva Halytskogo Street, 3B.
Customer: "ATB-Market" LLC
Duration of construction and installation works from December 12, 2022 to July 24, 2023.
The following works were performed:
Concrete works
Production and installation of a metal frame
Installation of sandwich panels
Installation of a ventilated facade
Installation of a roof made of PVC membrane
Arrangement of the stained glass system
Electrical works
Facing the floor and walls with ceramic tiles
Installation of water supply, sewerage, fire water supply
Painting works
Decoration of premises
Installation of plumbing equipment
Installation of automatic sliding doors
Installation of elevator equipment, installation of a lifting table
Installation of advertising media
Installation of PP and MK doors
MK fire protection
Complex of works on heating and ventilation, alarm system, installation of APS, installation of video surveillance
Landscaping of the surrounding area (landscaping, paving, paving, road signs, road markings)
Number of involved personnel: 46 specialists.