Object: Store of the retail chain "Silpo" 1266 M²
Address: Uzhhorod, Poshtova square, 4a.
Customer: "Silpo-Food" LLC
Duration of construction and installation works: from September 1, 2021 to April 20, 2022
The following works were performed:
- Electrical works
- Facing the floor and walls with ceramic tiles
- Installation of plasterboard partitions and false walls
- Installation of water supply and sewerage
- Painting works
- Decoration of premises
- Installation of the ventilation and air conditioning system
- Installation of metal and aluminum doors
- Installation of glass partitions in the sales hall
- Facing the columns with glass with a printed pattern
- Gluing decorative wallpaper on a frieze with a seal
- Installation of decorative rails on the ceiling and friezes
- Installation of a lifting table
- Installation of metal structures
Number of involved personnel: 46 specialists.
