
|
Object: Store of the retail chain "Silpo" 2332.8 M² Address: Lviv, st. Stryyska, 45. Customer: "Silpo-Food" LLC Duration of construction and installation works: from May 20 to September 18, 2021.
The following works were performed: · Electrical works · Facing the floor and walls with ceramic tiles · Wallpapering the walls of the administrative and household building and the trading hall · Installation of water supply and sewerage · Painting works · Decoration of premises · Installation of art objects of the design project
Number of personnel involved: 45 specialists. |
