Completed the whole range of works on the power supply and automation at the following facilities of the enterprise:
- Railway loading/unloading overpasses
- Pumping station (four pumps with electric drives with a capacity of 500 kW each using Danfoss frequency inverters
- Construction of the transformer substation-10/0.4 kV with a capacity of 2x2500 kW - Reconstruction of the distribution point)
- On-site networks
- Outdoor electric lighting of the territory and objects
- Lightning protection and grounding