Completed the whole range of works on the power supply and automation at the following facilities of the enterprise:

  1. Railway loading/unloading overpasses
  2. Pumping station (four pumps with electric drives with a capacity of 500 kW each using Danfoss frequency inverters
  3. Construction of the transformer substation-10/0.4 kV with a capacity of 2x2500 kW - Reconstruction of the distribution point)
  4. On-site networks
  5. Outdoor electric lighting of the territory and objects
  6. Lightning protection and grounding