The company "BuildService Group" completed the construction and installation works at the SPP "Sun Energy Mezhirich" with a capacity of 2 MW in Mezhirich, Dnipro Raion of Dnipropetrovsk Oblast
It should be noted, that the general contractor was ООО "EDS-ENGINEERING", and the company "BuildService Group" designed and installed all the metal structures for the solar panels.
The implementation of the project took a little more than a month, the works on an area of 4 hectares were performed from late March to May 2018. For 40 days, our specialists performed a geodetic breakdown of the site, drilled 2400 wells for the support stands of the metal structures, assembled and installed in the design position 100 metal structures for the installation photovoltaic modules, and also made the installation of the fencing for the site of SPP.
The entire volume of work was performed by 20 of our specialists with the involvement of 2 units of special machinery, including 2 JCB 4cx backhoe loaders.