Facility: SPP  "Sun Energy", 2 MW

Address Podgorodnoye Dnipropetrovsk Oblast

Customer: ООО "EDS-ENGINEERING"

Duration of construction works: July - August 2017

The following works were performed:

  • Design of metal structures for the installation of photovoltaic modules
  • Supply of metal structures to the facility.
  • Geodetic breakdown of the site.
  • Drilling wells for support stands - 3200 wells.
  • Assembly and installation of metal structures in the design position - 400 pieces.
  • Installation of a security fence of a site of a solar power station.

The number of staff at the facility: 20 specialists.

Special machinery:

  • 2 JCB 4cx backhoe loaders;